Town of Woodway Fee Schedule
| |
BUILDING/PERMIT
FEES |
FEE |
| 1. |
Building Permit Fee
Based on Total Valuation (includes swimming pools and game
courts) |
| Total Value |
Fee |
| $1 to $2,000 |
$85 |
$2,001
to
$25,000 |
$85 for the first $2,000 plus $17.50 for each additional $1,000 or fraction
thereof |
$25,001
to
$50,000 |
$490 for the first $25,000
plus $12.60 for each additional $1,000 or fraction
thereof |
$50,001
to $100,000 |
$805 for the first $50,000 plus $8.75 for each
additional $1,000 or fraction thereof |
$100,001
to
$500,000 |
$1,243 for the first $100,000 plus $7 for each
additional $1,000 or fraction thereof |
$500,001
to
$1,000,000 |
$4,043 for the first $500,000 plus $6 for each
additional $1,000 or fraction thereof |
| $1,000,001 and up |
$7,043 for the first $1,000,000 plus $2.80
for each additional $1,000 or fraction thereof |
|
| 2. |
Plan Check
Fee |
65% of Building Permit
fee |
| 3. |
Inspections |
Included in BP fee |
| 4. |
Mechanical
– New SFR |
$175 up to 2,000 sq.
ft.
$275 for 2001 - 3,000 sq. ft.
$375 for 3001 - 4,000 sq. ft.
$475 for 4001 - 5,000 sq. ft. |
| 5. |
Plumbing
– New SFR |
$175 up to 2,000 sq.
ft.
$275 for 2001 - 3,000 sq. ft.
$375 for 3001 - 4,000 sq. ft.
$475 for 4001 - 5,000 sq. ft. |
| 6. |
Remodels
(based on number of fixtures) |
$75 for 1 fixture
$125 for 2 to 4 fixtures
$175 for 5 to 7 fixtures
$225 for 8 to 10 fixtures
$275 for 11 to 13 fixtures
$325 for 14 + fixtures |
| 7. |
Fence |
Based on valuation |
| 8. |
Side Sewer
Fee |
$1070 adjusted annually |
| 9. |
Tributary
Lot Fee |
$914, adjusted annually |
| 10. |
Right of
Way – Routine Utility |
$150 + $250 deposit |
| 11. |
Right of
Way – Major Utility |
$200 + $250 deposit
+ costs |
| 12. |
Right of
Way – Private Homeowner |
$125 + $200 deposit
+ $250 engineer fee |
| 13. |
Roofing |
If necessary, based
on valuation |
| 14. |
Review of
Building Official’s Decision |
$150 per application |
| 15. |
Demolition
Permit |
Minimum $250, based
on valuation |
| 16. |
Code Interpretation
|
$100 plus costs |
| 17. |
Outdoor
Burning |
Prohibited |
| 18. |
Re-inspection
fees assessed under 108.8 |
$60/hour |
| 19. |
Other building
inspection fees not listed |
$60/hour |
| 20. |
Additional
Building Plan review required by changes, additions or revisions
to plan |
$60/hour, minimum
˝ hour |
| 21. |
Building
permit operational fee, based on total valuation |
| Total Value |
Fee |
| <$10,000 |
$25 |
| $10,000-$250,000 |
$125 |
| >$250,000 |
$250 |
|
| 22. |
Other plumbing
inspection fees not listed |
$50/hour |
| 23. |
Additional
Plumbing or Mechanical Plan review required by changes,
additions or revisions to plan |
$50/hour, minimum
˝ hour |
| 24. |
Renewal
of expired building permit |
˝ of original building
permit fee, plus operational fee, state fee, & plan
review if deemed necessary by Building Official |
| 25. |
Moving of
Building |
$75 plus deposit
if necessary |
| 26. |
Installation
of a moved residential structure onto a new site, including
the foundation, water hookup and the building drain connection |
$250 |
| 27. |
Grading
Plan Review Fees |
50 cubic yards - No fee
51 to 100 cubic yards - $47.00
101 to 1,000 cubic yards - $74.00
1,001 to 10,000 cubic yards - $98.50
10,001 to 100,000 cubic yards:
$98.50 for the first 10,000
cubic yards
plus $49.00 for each additional 10,000 yards or fraction
thereof
100,001 to 200,000 cubic yards:
$539.50 for the first
100,000 cubic yards plus $26.50 for each additional
10,000 cubic yards or fraction thereof
200,001 cubic yards or more:
$804.50 for the first 200,000
cubic yards plus $14.50 for each additional
10,000 cubic yards or fraction thereof
|
| 28. |
Grading
Permit Fees |
50 cubic yards - $47.00
51 to 100 cubic yards - $74.00
101 to 1,000 cubic yards:
$74.00 for the first 100 cubic
yards plus $35.00 for each additional
100 cubic yards or fraction thereof
1,001 to 10,000 cubic yards:
$389.00 for
the first 1,000 cubic yards plus $29.00 for each additional
1,000 yards or fraction thereof
10,001 to 100,000 cubic yards:
$650.00 for the first 10,000 cubic yards
plus $132.00 for each additional 10,000 cubic
yards or fraction thereof
100,001 cubic yards or more:
$1838.00
for the first 100,000 cubic yards plus $73.00 for each additional
10,000 cubic yards or fraction thereof
|
| 29. |
Additional
grading plan review or review of specialized reports required
by changes, additions or revisions to approved plans |
$100/hour (minimum
˝ hour) or actual cost |
| 30. |
Storm Drainage
and Erosion Control facilities and inspections and plan
review |
$75/hour plus engineering
review costs |
| B. |
LAND
USE FEES |
FEE |
| 1. |
Short Plat |
$1,500 plus $100/lot + costs |
| 2. |
Variance |
$1,000 plus costs |
| 3. |
Boundary Line Adj. |
$500 plus costs |
4. a. b.
|
Comp Plan Amendment
Site Specific Text Amendment |
No Fee Both or either
$1,000 plus costs $1,000 plus costs |
| 5. |
Zoning Ordinance Amendment |
$1,000 plus costs |
| 6. |
Wireless Facility Fee |
$4,000 plus costs |
| 7. |
Appeals |
$500 plus costs |
| 8. |
SEPA |
$500 plus costs |
| 9. |
Code Interpretation (complex) |
$100 plus costs |
| 10. |
Site Plan Review |
$250 |
11.
a.
b. |
Long Sub-Division Preliminary
Plat Final Plat |
$2,000 base plus $100/lot + costs
$1,500 base plus $50/lot + costs |
| C. |
LICENSES/OTHER
FEES |
FEE |
| 1. |
Business License |
$50 |
| 2. |
Home Occupation License |
$50
Delinquency fees: 15-30 days: $10/day 31-90
days: $25/day >90 days: $100/day |
3. a. |
Dog License Lifetime
|
$5.00 One time fee per above |
| 4. |
Audio Tapes |
$5.00 plus tape |
| 5. |
CD |
$10.00 |
| 6. |
Sign Permit |
$50 |
| 7. |
Insufficient Funds Fee |
$30 |
| 8. |
Copying public records |
$.15/page for letter or legal size;
actual cost for larger |
| 9. |
False Alarms |
$250/each response within 6 months |
|