Request an Inspection

Building & Planning

Related
Pages

Phase 2 Construction Restart

On April 29, 2020, Governor Inslee authorized implementation of a phased restart to construction projects. On June 5, 2020, Governor Inslee approved Snohomish County to enter Phase 2 of Safe Start – Washington’s Phased Reopening Plan.

Effective June 5, all limitations on construction activity found in Proclamation 20-25 and the Governor’s March 25 and April 29, 2020, memoranda are lifted for any project sited in a Phase 2 county, provided the construction activity follows the Phase 2 – Construction COVID-19 Requirements. Any paused construction activity may resume immediately if:

  • The employers and employees can meet and maintain all requirements listed in the Phase 2 – Construction COVID-19 Requirements document; and
  • The employers and employees conduct only those activities that are allowed under their county’s phase status.

Before recommencing work, all contractors are required to develop a comprehensive COVID-19 exposure control, mitigation, and recovery plan.  The required elements of the plan are outlined in the above link to the job site requirements.

Prior to restarting construction, the homeowner must send an email to the Town confirming that they have the requisite plan, that the plan meets the requirements of the Governor’s proclamation, and that the plan is posted at the job site and available for inspection while construction activities are taking place.

Failure to provide the requested email or comply with the posting requirements may result in sanctions, including the job being shut down.



To request a clearing & grading inspection, call John Forba of PACE Engineering at 425.827.2014.

To request a fire inspection, call Shoreline Fire Department at 206.533.6565.

To request a tree or right-of-way inspection, call Terry Bryant, Public Works Director, at 206.542.0183.

To request a building, demo, fence, mechanical, or plumbing inspection, fill in the request form below. Inspections are performed Tuesday through Thursday after 3:30 p.m. All inspections must be requested by 1:00 pm the business day prior to the desired inspection date.

Please note: some inspection requests have not come through, so please email permits@townofwoodway.com to confirm receipt.


Requestor Name:


Requestor Phone Number:


Requestor Email Address:


Property Address:


Subdivision & Lot Number (if applicable):

Permit Type:


Permit Number:


Describe type of inspection requested:


     

© 2023 Woodway, WA

23920 113th Place W. | Woodway, WA 98020 | 206.542.4443

The Town presents the information on this Web site as a service to its citizens and other Internet users. Although this site may contain information about legal issues, it is not intended to be legal advice. Additionally, due to on-going changes in Town, state and federal law and other factors, we make no warranty or guarantee concerning the accuracy or reliability of the content at this site or at any other sites to which we provide links.

Powered By Revize Login